Saudi Electric Company
the project was mainly for the construction of 3-No.s, 5,000 Cu.M (Capacity Per Each Tank) of Crude oil Fuel Storage Tanks on “Turn Key Basis”, along with the “Design & Construction” of ‘ Mechanical Maintenance Steel Bldg.’ & ‘ Main Testing Laboratory ‘of RCC Concrete Bldg